Aerial view of a square outdoor air conditioning condenser unit on a concrete pad beside a house wall with a sliding glass door.

HVAC Installation in Monroe, LA

A new system here will heat from November through March and cool from May through October every year. Tell us about the house, and a licensed contractor who covers Ouachita Parish will get in touch.

Tell us about the job

It takes about a minute.

Step 1 of 3: Equipment
Overhead view of an outdoor AC condenser unit on a concrete pad next to a house with a dark shingle roof.

Eleven months of work for a Monroe system

A new system in Ouachita Parish only gets one month off. Heat runs November through March, with winter nights averaging 37°F. Then cooling takes over from May through October, working against summer afternoons that average 92°F. That is eleven months where the system is doing something, and it needs to be sized right for both jobs, not just the one that comes to mind first.

Most homes here heat with electricity, so a power outage means no heat too. Louisiana saw a lot of that last year, with almost half of households losing power for at least a day. Wind is the more frequent threat over time. This parish has logged 86 damaging wind events over the past ten years, against 5 winter storms. A new installation is worth doing with that record in mind, from where the outdoor unit sits to how it is secured.

5 months
November through March, your system heats
6 months
May through October, it cools
37°F
the average winter night it heats against
92°F
the average summer afternoon it cools against
Isometric line illustration of a cutaway house showing interior rooms with furniture and ceiling ductwork, connected to an outdoor condenser unit with a fan beside the building.
Your system heats November through March and cools May through October.

NOAA nClimDiv, 1991–2020 normals

Louisiana requires HVAC contractors to hold a state license.

The license is issued to the contractor, not the job, so it covers this company's work in general rather than this specific installation on its own. That is the state's role here, a license held by the business and recorded by the Louisiana State Licensing Board for Contractors.

For an install like this in Ouachita Parish, the license is what stands behind the contractor doing the work, but the install itself still goes through the local building office. Most cities and counties require a permit before the new system goes in and an inspection once it's done, and that inspection is what checks the work itself, separate from whatever the license already covers.

Source: Louisiana State Licensing Board for Contractors

When should I replace my HVAC system?
Replace it when repairs stop making sense or the system can't keep up anymore. A furnace or air conditioner that needs a major repair, like a cracked heat exchanger or a failed compressor, is usually not worth fixing on an older unit. Rising energy bills with no other explanation, uneven temperatures room to room, and a system that runs constantly are also signs the equipment is wearing out rather than just having an off day. With 11 months a year of heat or cooling needed here, a system on its last legs does not get much of a break to recover.
Should I replace my furnace and air conditioner at the same time?
If both are old, replacing them together is usually the better move. A furnace and air conditioner installed at the same time are matched to work together, and pairing a new one with an old one can mean the newer unit never runs at its best. It also means one visit and one inspection instead of two separate jobs down the line. If one system is much newer than the other, a contractor can tell you whether it makes sense to wait or replace both now.
What happens during an HVAC installation?
A contractor removes the old furnace, air conditioner or heat pump and sets the new equipment in place, then connects it to the ductwork, the electrical supply, and for gas furnaces, the gas line. Refrigerant lines get connected and tested for leaks, and the system is run through a startup check to confirm it heats and cools correctly. Louisiana requires the contractor doing this work to hold a state license, and most cities and counties also require a permit and inspection once the installation is done. That inspection is there to confirm the work was done to code, so do not skip it even if the contractor does not bring it up.